Projects 

 

 


LAZOTEEIN has now become one of the most reliable companies in projects management as we succeeded to finalize properly huge projects managed by our projects department, these projects are:
Indoor substations 33/11KV:
Importing and erecting 10 indoor substations 33/11KV from Siemens to the national electricity corporation.
Integrated networks:
LAZOTEEIN now is widely known as a leader company in electrical networks, as we have our own experience in manufacturing concrete poles, and importing all sizes of cables and its accessories, the result of this experience was the successful manufacturing, installation, and commissioning of many integrated networks in Khartoum, Omdurman, and Khartoum north.
 

 

Lazoteein Company for Development and Investment implemented a number of projects affiliated to the National Electricity Corporation and the National Water Corporation including:

Electric grid project (1):

The contract signing date: 6 March 2008
Number of blocs: 9 blocs in Khartoum, Khartoum North and Omdurman
Implementation period according to contract signed with the National Electricity Corporation: 5 months
Handover of last bloc was made three months after signature of the contract, with high quality and efficiency according to the commendation of the National Electricity Corporation.
Electric grid project (2):
The contract signing date: 23 June 2008
Number of blocs: 6 blocs in Khartoum and Khartoum North
Implementation period according to contract signed with the National Electricity Corporation: 4 months
Handover of last bloc was made two months after signature of the contract, with high quality and efficiency
Electric grid project (3):
The contract signing date: 17 March 2009
Number of blocs: 38 blocs in Khartoum and Omdurman
Implementation period according to contract signed with the National Electricity Corporation: 2 years
Handover of last bloc was made nine months behind deadline, with high quality and efficiency according to the commendation of the Distribution Department

In this project, the electric grid for Hai Alshatie neighbourhood was implemented. It consisted of high tension grid (11KV), cable (3600 M 135*3), 8 transformers (1000 KVA), low tension grid with wire (ABC 120 MM). The implementation was carried out within a short period of time, with high quality and accuracy.

Supply and installation of 10 SIEMENS 33/11KV substations for the National Electricity Corporation.
Implementation of electric grids in villages built for the resettlement of people affected by the elevation of Roseires Dam.
Implementation of a number of maintenance works and partial grids
Supply of electricity pylons to Sudanese Distribution Company at the set time and with the prescribed quantities
Jebel Awliya Water Plant project
Mashkour Water Plant project
Alhamadi Water Plant project (Aleilafoon)


LAZOTEEIN has duly provided its services for several sectors of customers at different locations all over the country, following are some of them:
o National Electricity Corporation (NEC).
o Sudanese Pipeline Petroleum Company (SPPC).
o Japan International Cooperation Agency (JICA).
o Construction sector.
o Oil sector.
o Agricultural sector.
o Many individuals and corporations who trust our products and services.

LAZOTEEIN activities have expanded to include huge electrical projects such as importing and erecting indoor substations 33/11KV and executing electrical networks all over Sudan. LAZOTEEIN's expanding products also include Fuel Dispensers, motorcycles, Power cables, and all other accessories needed in integrated electrical networks.
LAZOTEEIN greatly enhances the quality of its products and services by supporting its customers with the required spare parts and complete after sale service for its products.
The main objective:
• Financing and service supplying to electrical projects and power solution of its customers.
• Provide high quality products to the customers who care about the quality.

The project management cooperates with area companies and programing companies to setup programatic information management (software) in order to locate and determined Electric-Columns, statations and cables pathes by satellites and these sophisticated programs that ensure the company has a new addition to the quality of the work from technically and accounting accurately.






The Mechanisms of the company which operate in integrated projectsnetworks:
-One Crane for Overhead Gantry Crain.
- Two Cranes (25) Tons for handling.
- Three Long-Vehicle Cranes for Transport and Agriculture.
- Two Excavators.
- Four Mixers for Concrete (Electricity - diesel).
- One Pump for Concrete.
- Vibrating Machines (gasoline - electricity (7)).
- Iron-Forma for Casting Various Columns (210).
- One Generator (100) kVA.
- One Generator (20) kVA.
- One Generator (5) kVA.


Employees Involve in the project:
Those who Work in the projects are a group of engineers and technicians who have demonstrated high efficiency in technical and administrative work through their pervious activities.

- Two Electrical EngineerS
- Mechanical Engineer
- Architect
- Civil Engineer
- surveying engineer
- Two surveying Technicians
- A civilian technician
- Twenty-four Electricians for Transmission Lines
- Five Electric-technicians for statation






 

 

 

 
 

 

 